Enemies have invaded your lands. Thousands of tanks and airplanes are ready to battle with you. Wars can not be avoided and you need to clash the alien face to face. Your enemies are not any monkeys - these are professional warriors! Only one side of the conflict will survive. To win you need to become king of TD.
Military equipment of your enemy is not a toy. Every battle with your enemy turns into battle royale. You and your enemy have modern equipment: tanks, ships, airplanes, artillery, mines and bombs. You and your enemy have modern equipment: tanks, ships, airplanes, artillery, mines and bombs.
Protect & Defense: Tower Zone is a tower defense game that will appeal to both professionals and new players.
You expect an interesting gameplay. All weapons and abilities are perfectly balanced. To win, you need to build new towers or update them. You also have the support of artillery, aviation and other bonuses. All towers have different abilities - some can damage few targets at the same time, while others shoot slowly but powerfully.
You will have to defend against many aliens using a variety of tactics. In the game you can customize fortifications as you wish. A flexible system for adjusting the level of difficulty will provide an exciting gameplay for any player.
Game features:
- Strategic tower defense td game
- Interesting gameplay
- Many tower with different abilities
- Bright and beautiful graphics
- More than 30 beautiful levels
We hope you enjoy our game!
Military equipment of your enemy is not a toy. Every battle with your enemy turns into battle royale. You and your enemy have modern equipment: tanks, ships, airplanes, artillery, mines and bombs. You and your enemy have modern equipment: tanks, ships, airplanes, artillery, mines and bombs.
Protect & Defense: Tower Zone is a tower defense game that will appeal to both professionals and new players.
You expect an interesting gameplay. All weapons and abilities are perfectly balanced. To win, you need to build new towers or update them. You also have the support of artillery, aviation and other bonuses. All towers have different abilities - some can damage few targets at the same time, while others shoot slowly but powerfully.
You will have to defend against many aliens using a variety of tactics. In the game you can customize fortifications as you wish. A flexible system for adjusting the level of difficulty will provide an exciting gameplay for any player.
Game features:
- Strategic tower defense td game
- Interesting gameplay
- Many tower with different abilities
- Bright and beautiful graphics
- More than 30 beautiful levels
We hope you enjoy our game!
| Latest Update | 2021-04-13 |
| Version | 1.3.10 |
| Game Uploaded By | docs.google.com |
| Requirements | Android 5.0 and up |
Best Similar Games
Protect & Defense: Tank Attack
4.5
500K
free
67M
Ancient Planet Tower Defense
4.6
5M
free
Defense Zone 3 HD
4.6
5M
free
201M
World War: Fight For Freedom
4.3
10M
free
Candy Match 3
4.2
50K
free
36M
Educational Puzzles for Kids
3.9
1M
free
Go Free
4.3
5M
free
30M
Candy Puzzle - Match 3 Game
4.1
10K
free
58M
Build a House: Building Trucks
3.8
1M
free
97M
Train Games for Kids: station
4.1
5M
free
88M
Baby Care Game
4.2
10M
free
59M
AR Cat
2.9
free